 |
 |
|
FROM RISK MANAGEMENT TO SUPPORT
|
 |
 |
STEP 1 /
ANALYSIS |
• Inspection and determination of the operational risks
• Determination of the calculation basis and detailed
risk analysis for all lines
• Analysis of the conditions taken as a basis
• Identification and assessment of risks
|
 |
 |
|
 |
 |
STEP 2 /
CONCEPT |
• Risk profile and recommendations
|
 |
 |
 |
|
 |
 |
STEP 3 /
INTERIM
PRESENTATION |
• Presentation of the interim results – national/international
• Rating of insurers
Definition of further risk improvement measures
• Setting the time table
|
 |
 |
|
 |
 |
STEP 4 /
IMPLEMENTATION |
• Development of the optimum risk and insurance concept – national/international
• Detailed and binding negotations with the desired insurers on premiums, conditions,
international programme
|
 |
 |
|
 |
 |
STEP 5 /
FINAL PRESENTATION
|
• Representation of results in premiums, amounts,
risk improvements, insured risks
• Contract samples
• International programme implementation
|
 |
 |
 |
|
 |
 |
STEP 6 /
SUPPORT
|
• Implementation of the risk concept adopted – national/international
• Handling and attending of the national and international insurance programmes
• Claims management
• Adequate, regular determination of the risk changes and attendance to risk
improvement measures
• Detailed annual review
|
 |
 |
|
 |
 |